ShiptrailLive map

CRITICAL PATH

🇺🇸 United States, sailing vessel

Stopped near Newport News, United States.Last report .

MMSI 368217260Call sign WDM5580

Follow her on the live map
Illustration, not a photo. Have one? Add it to Wikimedia Commons.

Particulars

MMSI368217260
Call signWDM5580
FlagUnited States
Vessel typeSailing vessel
Length overall14 m
Beam4 m

From her own AIS broadcasts.

Her MMSI

368217260

The first three digits, 368, are the country code of the United States: an MMSI follows a ship's flag, so a new flag brings a new number.

She broadcasts no IMO number. Only larger seagoing ships are required to have one.

Her AIS details

AIS is the radio signal a ship sends so that other ships can see her. This is what her signal tells us.

Seen from above, bow to the right, so port is the upper side. The ring is her GPS aerial, where her crew or installer said it sits. Shiptrail draws the aerial's position, not the middle of the ship.
AIS classClass BWorked out, not reported: only Class A transponders send a status, and she sends none. Class B is the lighter kind on yachts, fishing boats and other small craft, which reports less often.
To the bow13 m (A)
To the stern1 m (B)
To the port side3 m (C)
To the starboard side1 m (D)
Heard fromAISStream
On the map since

A, B, C and D are AIS's own names for these four distances.

From her own AIS broadcasts as the feed delivers them.

Ships near her

Where she is

Map © OpenStreetMap contributors © CARTO

Position37.0249° N, 76.3406° W
SpeedStopped, 0.0 knots

Voyage

From
Newport News, United StatesStopped here now
To
Not reported
ETA
Not reported