Particulars
| MMSI | 368437760 |
|---|---|
| Call sign | WDQ5787 |
| Flag | United States |
| Vessel type | Pleasure craft |
| Length overall | 21 m |
| Beam | 5 m |
From her own AIS broadcasts.
Her MMSI
368437760
The first three digits, 368, are the country code of the United States: an MMSI follows a ship's flag, so a new flag brings a new number.
She broadcasts no IMO number. Only larger seagoing ships are required to have one.
Her AIS details
AIS is the radio signal a ship sends so that other ships can see her. This is what her signal tells us.
| AIS class | Class BWorked out, not reported: only Class A transponders send a status, and she sends none. Class B is the lighter kind on yachts, fishing boats and other small craft, which reports less often. |
|---|---|
| To the bow | 18 m (A) |
| To the stern | 3 m (B) |
| To the port side | 3 m (C) |
| To the starboard side | 2 m (D) |
| Heard from | AISStream |
| On the map since |
A, B, C and D are AIS's own names for these four distances.
From her own AIS broadcasts as the feed delivers them.
Ships near her
- CUTNAIL Pleasure craftunder 0.1 nm
- GOLDFISH Pleasure craft0.1 nm
- ONWARD Pleasure craft0.1 nm
- SILHOULETT Pleasure craft0.2 nm
- NO BAD DAYS Pleasure craft0.2 nm
- PANACEA Pleasure craft0.2 nm
- HAPPY Pleasure craft0.2 nm
- SALTY COWBOY Pleasure craft0.3 nm
Where she is
Map © OpenStreetMap contributors © CARTO
| Position | 26.1075° N, 80.1246° W |
|---|---|
| Speed | Stopped, 0.0 knots |
| Local time |
Voyage
- From
- Fort Lauderdale, United StatesStopped here now
- To
- Not reported
- ETA
- Not reported
Weather where she is
Model estimate for her position, from Open-Meteo.